Resin floor installation
Epoxy, PU screed, MMA and flake systems selected around traffic, cleaning, slip resistance and available downtime.
Explore resin flooring →Epoxy resin floors, concrete preparation and pumped screeds for factories, warehouses and workshops. We price and deliver the complete flooring package, from worn concrete to a finished working floor.
Have photos or plans? CCNW WhatsApp →
Tell us the location, floor area and intended use. An estimate is fine.
Liverpool · Wirral · Cheshire · Manchester · North Wales. Larger UK projects considered.

Explore genuine CCNW installations. Full photographic galleries are available on each project page.

Grinding, epoxy DPM, joint repairs and two coats of epoxy.
View project →
Diamond grinding, epoxy DPM, repairs and a protective finish.
View project →
Decorative resin flake flooring for a commercial space.
View project →Bring the floor condition, use and programme together in one scope. We work with business owners, facilities teams and main contractors on complete installations and standalone preparation packages.
Epoxy, PU screed, MMA and flake systems selected around traffic, cleaning, slip resistance and available downtime.
Explore resin flooring →Diamond grinding and shot blasting to remove unsuitable coatings and prepare the concrete for the next flooring system.
Explore floor preparation →Pumped bagged levelling compounds, local repairs and moisture-control systems where the assessed substrate requires them.
Explore pumped screed →Hard-wearing resin flooring for factories, warehouses, workshops and commercial spaces.
Explore →Decorative, durable resin flake finishes for workshops, garages and commercial environments.
Explore →Fast-curing flooring systems for projects where operational downtime needs to be minimised.
Explore →Mechanical concrete preparation for coatings, resin systems and industrial flooring.
Explore →Controlled preparation, laitance and coating removal using industrial grinding equipment.
Explore →Bagged self-levelling screeds, specialist pumped applications and subfloor preparation for larger projects.
Explore →Own continuous mixing and pumping equipment for bagged cementitious levelling compounds.
Explore →Moisture-control systems used as part of correctly specified commercial flooring preparation.
Explore →Resin screed options for demanding production and processing areas, subject to the required temperature, cleaning and slip-resistance specification.
Explore →Smooth resin finishes for commercial and industrial interiors where the substrate and working environment suit the system.
Explore →Forklift turns, pallet routes and workshop bays concentrate wear. Start with preparation, local repairs and a floor build-up suited to the traffic.
Warehouse flooring →Specify the finish around what lands on the floor and how it is cleaned. Texture, chemical compatibility and maintenance need considering together.
Production flooring →Plan the work area, stock movement and curing window before installation. Phased access or faster-curing systems may suit the project.
Discuss faster-curing systems →The best starting point is your operation, rather than a product name. Here is what we review when discussing the options.
| System | Where to consider it | What to check first |
|---|---|---|
| Epoxy coatings | Sealed concrete floors in storage, workshops and general industrial interiors. | Substrate strength, wear, vehicle turning, coating build-up and the required texture. |
| Self-levelling epoxy | Working interiors requiring a smooth resin finish and an appropriate higher-build system. | Floor levels, loading, moisture and whether smooth or textured finishing suits the use. |
| PU screed | Production areas with demanding cleaning, heat or process exposure. | The exact product and thickness, cleaning temperatures and chemical compatibility. |
| MMA systems | Suitable projects where a restricted shutdown makes curing speed a priority. | Ventilation, odour management, application conditions and agreed reopening times. |
Final performance depends on the complete installed system. Chemical resistance, slip resistance and return-to-service must be agreed against product data and actual site conditions.
Not sure which system fits? Send photos and describe how the floor is used →
A forklift route, food-production area and vehicle workshop do different jobs. We assess the concrete, contamination, moisture, traffic and cleaning requirements before agreeing the preparation and finish. Our plant includes industrial grinders, shot blasting equipment and a continuous mixing and pumping setup.
Send your postcode, approximate square metres, floor condition and target programme. We can discuss the scope and arrange a site assessment where needed before confirming a written quotation.
enquiries@commercialcoatings.co.siteShare photos, location, approximate area, intended use and timescale.
Assess the substrate and access, then define preparation, repairs, finish and programme.
A priced scope covering the agreed labour, materials and plant, with options where useful.
Complete the agreed works and confirm curing, return-to-use and care requirements.
Have a tender package ready? Send drawings and specifications for a priced flooring package →
Yes. A typical scope can include mechanical preparation, local concrete repairs, a moisture-control layer where required and a specified resin finish. Existing coatings, oil contamination and weak concrete need assessing before the scope is confirmed.
Yes. We quote standalone concrete preparation packages for contractors and flooring installers, as well as complete resin installations. The preparation method depends on the substrate and the requirements of the next system.
The price depends on floor area, concrete condition, repairs, contamination, moisture treatment, resin thickness, access and programme. Send photos, the site location and approximate area so we can discuss the likely scope. A confirmed price follows the agreed specification and any necessary site assessment.
Preparation, installation and curing all affect the programme. The return-to-service time depends on the selected product, temperature and whether the floor needs to take foot traffic, vehicles or chemicals. We agree those requirements before specifying a system; faster-curing MMA may suit some time-sensitive projects.
Tell us about shift patterns, access restrictions and working areas. We can discuss phased or out-of-hours work where practical. Availability and the final programme are confirmed for the individual project.
We are North West based and cover Liverpool, Wirral, Chester, Cheshire, Warrington, Manchester and North Wales. Suitable larger industrial projects across the UK are considered according to scope, location and programme.
Refurbishing a warehouse, opening a workshop or preparing a commercial unit? Send your project details and speak directly with Reuben about the next step.